The port cranes are almost ready, and we are thinking that the port will be (at) full operation by the end of this year. Zhang Baozhong More Quotes by Zhang Baozhong More Quotes From Zhang Baozhong Even if you have a very good port, (if) you don't have an inland transporting system and the economy in the near area is not very positive, the port will not be fully utilised. Zhang Baozhong industrials